Trower Road pedestrian overpass handrail replacement

The Department of Infrastructure, Planning and Logistics is conducting maintenance works to the Trower Road pedestrian overpass near the Jingili Water Gardens.

The maintenance will include replacing and raising the handrail which has deteriorated over time, along with concrete repairs.

Works are expected to commence mid-September 2023 and take 4 weeks to complete.

Pedestrian access on the overpass will be restricted during the hours of works, however pedestrians will be directed to safely cross Trower Road at Rapid Creek Road or Lakeside Drive intersections. Access will be reinstated when no works are occurring.

Trower road

Contact

Cielo Alvaran, Project Manager
08 8999 4673
cielo.alvaran@nt.gov.au


Give feedback about this page.

Share this page:

URL copied!