DIPL projects
This page has information relating to the planning and construction of projects in the Northern Territory.
Search by region
Filter
Filter
By project type
By project status
Abala Road bus stop path and parking bay upgrade
The project aims to upgrade three bus stops within the Marrara Sporting Complex to improve passenger experience and pedestrian safety.
Type: Roads and transport
Status: Completed
Alice Springs CBD revitalisation
The Alice Springs CBD is being invigorated to create a safer and more vibrant CBD for locals and visitors to enjoy.
Type: Buildings and infrastructure
Status: Underway
Alice Springs flood mitigation
The project aims to reduce flooding impacts in the Alice Springs region.
Type: Lands and planning
Status: Planning and consultation
Alice Springs industrial land consultation
Read about the consultation to learn about industrial land needs in Alice Springs.
Type: Lands and planning
Status: Planning and consultation
Alice Springs urban asphalt program 2021
Type: Roads and transport
Status: Completed
Amity House demolition
The Department of Infrastructure, Planning and Logistics is demolishing the building at 155 Stuart Highway, Parap and clearing the site.
Type: Buildings and infrastructure
Status: Underway
Arnhem Highway - Adelaide River floodplain upgrade
The project aims to reduce road closures during the wet season along the Arnhem Highway.
Type: Buildings and infrastructure
Status: Underway
Arnhem Highway duplication planning study
The Northern Territory Government is undertaking a planning study for the future duplication of a 10 kilometre section of the Arnhem Highway from the Stuart Highway intersection to Kostka Road in Humpty Doo.
Type: Roads and transport
Status: Planning and consultation
Austin Lane enhancement
The NT Government worked in partnership with City of Darwin to enhance the Austin Lane streetscape with the construction of two covered walkways.
Type: Buildings and infrastructure
Status: Completed
Bagot Road - improving cycling
A planning study to improve cycling conditions including development of concept design options.
Type: Roads and transport; Lands and planning
Status: Planning and consultation
Batchelor Airport Master Plan
The master plan for Batchelor Airport will transform the existing airstrip into an aviation hub, supporting a range of commercial general aviation activities over the long term.
Type: Roads and transport
Status: Planning and consultation
Berrimah gravity sewer construction
The Department of Infrastructure, Planning and Logistics is constructing a new sewer main in Berrimah to support growth and future development in the area.
Type: Buildings and infrastructure
Status: Underway
Berrimah Road duplication
Read about the future duplication of Berrimah Road, between the Stuart Highway and Tiger Brennan Drive.
Type: Roads and transport
Status: Planning and consultation
Boulter Road stormwater infrastructure upgrades
The Northern Territory Government is upgrading stormwater infrastructure on Boulter Road.
Type: Lands and planning
Status: Underway
Building reform
The Northern Territory Government is prioritising reforms to building regulations to ensure confidence in the local building industry. These reforms are to enhance protections and improve quality-housing outcomes for Territory home owners and investors.
Type: Buildings and infrastructure
Status: Planning and consultation
Buntine Highway investment strategy
Type: Roads and transport
Status: Planning and consultation
Bus stop 70 Darwin City - returning to Cavenagh Street
Bus stop 70 in Darwin City is moving back to Cavenagh Street.
Type: Roads and transport
Status: Completed
Carpentaria Highway major upgrade
Type: Roads and transport
Status: Planning and consultation
Central Arnhem Road Corridor upgrades
Type: Roads and transport
Status: Planning and consultation
Chung Wah and Emery Avenue roundabout
Type: Roads and transport
Status: Planning and consultation
Coolalinga Road safety upgrades
Read about the staged road upgrades at Coolalinga.
Type: Roads and transport
Status: Planning and consultation
Corroboree Access Road upgrade and seal
The Department of Infrastructure, Planning and Logistics will be undertaking works to upgrade and seal 2.6 kilometres of the Corroboree Billabong Access road from the end of the existing seal up to the cattle grid.
Type: Roads and transport
Status: Completed
Cotton Gin intersection – Stuart Highway, Katherine
The Department of Infrastructure, Planning and Logistics (DIPL) is undertaking works on the Stuart Highway, to support the new Cotton Gin facility.
Type: Roads and transport
Status: Underway
Cox Peninsula Road and Darwin River Road intersection upgrade
The upgrade will enhance safety and improve the flow of traffic.
Type: Roads and transport; Lands and planning
Status: Completed
Cox Peninsula Road and Southport Road intersection upgrade
The upgrade will involve widening Cox Peninsula Road to accommodate dedicated left and right turning lanes onto Southport Road.
Type: Roads and transport
Status: Underway
Daly River boat ramp upgrades
Type: Buildings and infrastructure
Status: Completed
Darwin and Palmerston bus stop upgrades
Upgrade to 12 bus stops across the Darwin and Palmerston network to improve passenger experience and safety.
Type: Roads and transport
Status: Completed
Darwin bus stop upgrades
The Department of Infrastructure, Planning and Logistics is upgrading six bus stops across the Darwin network to improve passenger experience and safety.
Type: Roads and transport
Status: Completed
Darwin Living Lab House Comfort Ratings
Information about the Darwin Living Lab project to develop new voluntary comfort ratings for Darwin residential building designs.
Type: Buildings and infrastructure
Status: Planning and consultation
Darwin Passenger Rail Terminal
The Northern Territory Government is investigating alternate locations for the Darwin Passenger Rail Terminal, with a tender released to undertake a feasibility study.
Type: Buildings and infrastructure
Status: Planning and consultation
Darwin Urban Asphalt Projects 2021
The asphalt repair works will take place at night to reduce disruption to traffic and businesses.
Type: Roads and transport
Status: Completed
Dorat Road culvert replacements and floodway upgrade
Type: Roads and transport
Status: Completed
Dundee Beach boat ramp
Works to improve functionality of the Dundee Beach boat ramp.
Type: Buildings and infrastructure
Status: Underway
Dundee Place Road Upgrades
The Department of Infrastructure, Planning and Logistics is upgrading sections of Dundee Place, Namarada Drive and Balanda Drive.
Type: Roads and transport
Status: Completed
Elcho Island Airstrip
Read about a new, secure aircraft compound to be constructed at the Elcho Island Airport in Arnhem Land.
Type: Buildings and infrastructure
Status: Underway
Emergency Vehicle Priority (EVP) system
The Department of Infrastructure, Planning and Logistics is trialling an emergency vehicle priority (EVP) system to improve ambulance emergency response times.
Type: Roads and transport
Status: Underway
Enabling infrastructure for Holtze development
Find out more about the development of a residential subdivision on Crown land in Holtze.
Type: Lands and planning
Status: Underway
Former Don Dale Youth Detention Center site demolition
The Department of Infrastructure, Planning and Logistics is demolishing the former Don Dale Youth Detention Centre site on Tivendale Road, Berrimah.
Type: Buildings and infrastructure
Status: Underway
Garramilla Boulevard and Tiger Brennan Drive duplication
Read about a new entry point into Darwin's CBD.
Type: Roads and transport
Status: Completed
Gunn Point - Emerging Agribusiness Precinct (EAP)
Read about the Department of Infrastructure, Planning and Logistics (DIPL) is conducting initial site investigations at the Gunn Point Emerging Agribusiness Precinct (EAP), NT Portion 2626, 3820 Gunn Point Road, Koolpinyah.
Type: Lands and planning
Status: Planning and consultation
Gunn Point and Glyde Point Road planning study
Read about the planning study to inform the concept development for Gunn Point Road and confirm the most appropriate alignment for Glyde Point connection.
Type: Roads and transport
Status: Planning and consultation
Heat mitigation trial - Zones 1 to 5
Read about heat mitigation methods trialled along Cavenagh Street, between Bennett and Knuckey Streets.
Type: Buildings and infrastructure
Status: Completed
Heavitree Gap planning study
Read about the study to investigate a long-term infrastructure solution for duplicating the road through the Heavitree Gap.
Type: Roads and transport
Status: Planning and consultation
Hospital precinct intersection upgrade
The Northern Territory Government is upgrading the hospital precinct intersection at Rocklands Drive and Florey Avenue.
Type: Roads and transport
Status: Planning and consultation
Kakadu Highway fatigue management zones
Type: Roads and transport
Status: Completed
Karama walkways
Implementation of recommendations from a planning study for pedestrian safety improvements on Vanderlin Drive in Karama.
Type: Roads and transport
Status: Completed
Katherine flood mitigation
Read about the project that aims to better protect Katherine properties against flooding.
Type: Lands and planning
Status: Underway
Katherine heavy vehicle alternate route planning study
Future development of Katherine, particularly for heavy vehicle movements.
Type: Roads and transport
Status: Completed
Katherine High School STEAM Centre
The Department of Infrastructure Planning and Logistics (DIPL) is conducting works at Katherine High School to build a new STEAM Centre.
Type: Buildings and infrastructure
Status: Underway
Katherine Logistics and Agribusiness Hub
Information about developing Katherine’s regional horticultural and agricultural potential, and also as a logistics hub.
Type: Buildings and infrastructure; Lands and planning
Status: Planning and consultation
Lambrick Avenue and Hutchison Terrace intersection upgrade
The project upgrades the intersection of Lambrick Avenue and Hutchison Terrace.
Type: Roads and transport
Status: Underway
Leanyer Primary School - new classroom building
Construction of a new classroom building at Leanyer Primary School.
Type: Buildings and infrastructure
Status: Underway
Lee Point Road shared path
Information on the development of a new shared pedestrian and cycle path along Lee Point Road.
Type: Buildings and infrastructure; Roads and transport
Status: Completed
Litchfield Park Road - road widening of 2 sections between CH17km to CH19km
The project will undertaking roadworks on Litchfield Park Road in 2 sections between Batchelor and the Florence Falls/Buley Rockhole turnoff.
Type: Roads and transport
Status: Completed
Litchfield Park Road widening
The Northern Territory Government and Australian Government is widening a section of Litchfield Park Road between Batchelor and the Buley/Florence turnoff to improve road safety.
Type: Roads and transport
Status: Completed
Little Mindil Beach footpath erosion remediation
This project aims to provide a long-term solution to fix an eroded footpath on Little Mindil Beach.
Type: Roads and transport
Status: Completed
Lot 495, Town of Katherine – demolition
The Department of Infrastructure, Planning and Logistics (DIPL) is demolishing the old buildings and clearing the site on Lot 495, Town of Katherine.
Type: Buildings and infrastructure
Status: Planning and consultation
Mango roads upgrade and seal
This project aims to improve mango quality and increase local industry productivity.
Type: Roads and transport
Status: Completed
Marrakai Road – upgrade and seal Arnhem Highway to Stephen Road
The Department of Infrastructure, Planning and Logistics (DIPL) is upgrading the Arnhem Highway and Marrakai Road intersection, and Marrakai Road, from the Arnhem Highway to Stephen Road.
Type: Roads and transport
Status: Underway
Marrara - upgrade of entry ways
Type: Roads and transport
Status: Completed
Marrara detention basin
The Marrara detention basin is currently being constructed on the corner of McMillans Road and Henry Wrigley Drive in Marrara to temporarily detain storm water flows from Anula, Moil and parts of Marrara.
Type: Roads and transport; Lands and planning
Status: Completed
Maryvale Road
Read about the upgrading and sealing of approx. 10kms of Maryvale Road.
Type: Roads and transport
Status: Planning and consultation
McMillans Road and Kalymnos Drive intersection upgrade
The Australian and Northern Territory governments are enhancing safety at the McMillans Road and Kalymnos Drive intersection.
Type: Roads and transport
Status: Completed
McMillans Road and Mueller Road intersection upgrade
The McMillans Road and Mueller Road intersection upgrade aims to improve safety for road users when entering and exiting Mueller Road.
Type: Roads and transport
Status: Completed
McMillans Road, Northlakes pedestrian crossing
This study looked at ways to improve pedestrian safety on McMillans Road near Northlakes Shopping Centre.
Type: Roads and transport; Lands and planning
Status: Underway
Middle Arm Sustainable Development Precinct
The precinct will be a master planned area with a focus on low emission hydrocarbons, green hydrogen, advanced manufacturing, carbon capture and storage and minerals processing.
Type: Buildings and infrastructure; Lands and planning
Status: Planning and consultation
Minmarama stockpile investigations
The Department of Infrastructure, Planning and Logistics is investigating the stockpiles located next to Minmarama Park on Dick Ward Drive.
Type: Lands and planning
Status: Underway
Mount Johns flood immunity: Alice Springs
Read about funding for improve flood immunity for residents and businesses in the Mount Johns Valley and Desert Springs areas.
Type: Roads and transport
Status: Planning and consultation
Myilly Point landscaping and playground
A project that aims to create cool active spaces at Myilly Point.
Type: Buildings and infrastructure
Status: Completed
Myilly Point road works
The Northern Territory Government, in collaboration with the City of Darwin, is installing street lights and upgrading the intersection of Lambell Terrace and Mitchell Street, Larrakeyah.
Type: Roads and transport
Status: Completed
National Construction Code 2022 - Northern Territory variations
As part of the preparation for the National Construction Code 2022, the Northern Territory Government reviewed its variations to provisions and requirements.
Type: Buildings and infrastructure; Lands and planning
Status: Planning and consultation
NT shared path network reviews
Type: Roads and transport; Lands and planning
Status: Planning and consultation
Palmerston bus stop upgrades
The Department of Infrastructure, Planning and Logistics is upgrading four bus stops across the Palmerston network to improve passenger experience and safety.
Type: Roads and transport
Status: Underway
Palmerston Regional Fire Response and Emergency Services complex
Type: Buildings and infrastructure
Status: Underway
Paru Road upgrades - Melville Island
The Department of Infrastructure, Planning and Logistics is upgrading and sealing approximately 9kms of Paru Road on Melville Island.
Type: Roads and transport
Status: Underway
Pinelands road safety upgrades
Information about the Pinelands and Holtze upgrade consultations.
Type: Roads and transport
Status: Planning and consultation
Planning infrastructure for future integrated ferry services study
Read about the study to analyse a number of potential sites for future ferry terminals.
Type: Roads and transport
Status: Planning and consultation
Planning reform
This project aims to deliver a best practice land use planning system for the Territory. The reform includes extensive changes to planning legislation, the NT Planning Scheme, online systems and information, and administrative processes.
Type: Lands and planning
Status: Underway
Point Stuart Access Road upgrades
The Department of Infrastructure, Planning and Logistics will be undertaking works to upgrade the Point Stuart Access Road.
Type: Roads and transport
Status: Completed
Port Keats Road and Saddle Rail Creek bridge upgrades
The project aims to improve flood immunity and safety for road users.
Type: Roads and transport
Status: Completed
Residential Development in Katherine East
Addressing Katherine’s rental housing shortage
Type: Lands and planning
Status: Planning and consultation
Richardson Park community space
Read about the project to enhance and activate the Richardson Park area for the community (residents) and Ludmilla Primary School.
Type: Buildings and infrastructure
Status: Underway
Road safety program
The National Road Safety Program funds effective road safety treatments on urban, rural and regional roads to provide greater benefits for all road users.
Type: Buildings and infrastructure; Roads and transport
Status: Underway
Safety upgrades at Larapinta Drive, Blain Street and Diarama Close
This planning study aims to get feedback on safety upgrades at Larapinta Drive, Blain Street and Diarama Close.
Type: Roads and transport
Status: Planning and consultation
Shiers Street Housing Redevelopment
This project is to redevelop the public housing complex to transform this site into a modern, fit for purpose precinct with a mix of social and affordable housing.
Type: Buildings and infrastructure
Status: Underway
Signalising left turns into Tiger Brennan Drive from Benison, Tivendale and Wishart Roads
Works to signalise the left turns into Tiger Brennan Drive from Benison, Tivendale and Wishart Roads.
Type: Roads and transport
Status: Completed
Social Housing Accelerator Payment
The Australian Government has committed $50 million to deliver up to 100 new social and accessible homes across the Territory.
Type: Buildings and infrastructure
Status: Underway
Stuart Highway and Cox Peninsula Road intersection upgrade
The upgrades will improve merging facilities and enable traffic separation through the construction of a wide centreline treatment with a road safety barrier.
Type: Roads and transport
Status: Completed
Stuart Highway duplication at Katherine East
The project aims to duplicate the Stuart Highway at Katherine East.
Type: Roads and transport
Status: Underway
Stuart Highway median upgrades
Upgrades to Stuart Highway medians near Geranium, Hassan, and Queen Streets enhance safety, with works scheduled for early 2024; minimal parking impact.
Type: Roads and transport
Status: Underway
Stuart Highway Road Safety Improvements– Stuart Park
The project aims to improve road safety on the Stuart Highway, from Armidale Street to the Westralia Street intersections in Stuart Park.
Type: Roads and transport
Status: Planning and consultation
Stuart Park to Woolner shared path and ramp
The project will improve connectivity between Tiger Brennan Drive path network and Stuart Park’s path network.
Type: Roads and transport
Status: Completed
Supporting Growth in Katherine East
The Supporting Growth in Katherine East project will provide serviced superlot parcels of flood-free land for ongoing residential, commercial and community purposes.
Type: Lands and planning
Status: Underway
Tanami Road upgrades
The Northern Territory Government is upgrading and sealing 150kms of the Tanami Road in Central Australia, a jointly funded project between the Australian and Northern Territory Governments.
Type: Roads and transport
Status: Underway
Tennant Creek entry statements
The Northern Territory Government is delivering iconic tourism entry statements in Tennant Creek. The entry statements will be located on the southern and northern Stuart Highway approach to the town.
Type: Buildings and infrastructure
Status: Underway
Tennant Creek to Darwin infrastructure corridor
Type: Buildings and infrastructure; Lands and planning
Status: Planning and consultation
Territory-wide audit of septic tank type sewerage systems at all NT Government-owned and managed locations
The Northern Territory Government is committed to providing safe public housing and infrastructure throughout the Territory. Conducting on-site audits of septic tank type sewerage systems is an important step in ensuring their safety and functionality.
Type: Buildings and infrastructure
Status: Underway
Tiger Brennan Drive and Berrimah Road intersection overpass
The project aims to enhance safety and improve connectivity by separating the major flow of traffic at the intersection.
Type: Buildings and infrastructure
Status: Underway
Tiger Brennan Drive and Wishart Road intersection upgrades
The Northern Territory Government is upgrading the intersections of Tiger Brennan Drive/Wishart Road and Wishart Road/Kirkland Road.
Type: Roads and transport
Status: Completed
Trower Road pedestrian overpass handrail replacement
The Department of Infrastructure, Planning and Logistics is conducting maintenance works to the Trower Road pedestrian overpass near the Jingili Water Gardens.
Type: Roads and transport
Status: Completed
Upgraded and new pedestrian crossings
The project will upgrade and construct pedestrian crossings at Trower Road and Parer Drive intersection, and the the Rapid Creek side of McMillans Road and Rothdale Road intersection.
Type: Roads and transport
Status: Underway
Use of capsicum spray by Transit Officers
The Northern Territory Government is committed to providing and maintaining a safe and secure bus network.
Type: Roads and transport
Status: Underway
Vanderlin Dr and Lee Point Rd intersection
A planning study to look at future options to upgrade Vanderlin Drive and Lee Point Road intersection.
Type: Roads and transport; Lands and planning
Status: Planning and consultation
Vanderlin Drive / Leanyer Drive - Safe crossing and connectivity improvement
The Department of Infrastructure, Planning and Logistics is upgrading the Vanderlin Drive and Leanyer Drive intersection and shared path to improve pedestrian safety and provide safe access to the Hibiscus Shopping Centre. Vanderlin Drive and Leanyer Drive intersection and shared path upgrade is now completed.
Type: Roads and transport
Status: Completed
Vanderlin Drive duplication planning study
The Northern Territory Government is undertaking a planning study to investigate the future duplication of Vanderlin Drive between the Stuart Highway and McMilllans Road.
Type: Roads and transport
Status: Planning and consultation
Variable message signs on Territory roads
The Northern Territory Government is installing thirty (30) Variable Message Signs (VMS) across the Territory to provide timely and accurate information to travellers.
Type: Roads and transport
Status: Underway
Victoria Highway roadworks
The Northern Territory Government is upgrading the Victoria Highway on a 60km stretch, starting 40km west of Katherine, to improve safety for road users.
Type: Roads and transport
Status: Underway
VMBs at boat ramps
The Department of Infrastructure, Planning and Logistics (DIPL) is installing variable message boards (VMBs) at various Darwin boat ramps to help keep Territorians safe.
Type: Buildings and infrastructure
Status: Underway
Wagait Tip remediation
Environmental remediation for the Wagait Tip.
Type: Roads and transport
Status: Completed
Weddell Freeway Planning Study
A planning study into the potential development of the Weddell Freeway.
Type: Roads and transport; Lands and planning
Status: Planning and consultation
Zuccoli Primary School
Information about a new government school in Palmerston.
Type: Buildings and infrastructure
Status: Underway
Give feedback about this page.
Share this page:
URL copied!