Abala Road bus stop path and parking bay upgrade

Latest update

This project is now complete.

The Department of Infrastructure, Planning and Logistics is upgrading three bus stops within the Marrara Sporting Complex to improve passenger experience and pedestrian safety.

The shared paths at two bus stops (253 and 254) will be realigned to help ease congestion and allow more space for pedestrians and bus passengers.

The gravel bus bay and verge in front of bus stop 255 will be upgraded to asphalt surfacing to improve road conditions for traffic.

Works will commence in late-October 2020 and are expected to be completed by mid-December 2020 (weather permitting).

Construction will not interfere with bus timetables or routes and a temporary bus stop will be installed during construction.

Maps and concept images

Map of Abala Road and bus stop upgrades

Previous announcement

Read the Abala Road bus stop path and parking bay upgrade fact sheet PDF (258.9 KB).

Contact

Project Manager: James Stanway
Phone: 08 8999 4618
Email: james.stanway@nt.gov.au


Give feedback about this page.

Share this page:

URL copied!